Design Information

Sarpy County and Cities Wastewater Agency Design Information

Preliminary Engineering Report Phase 1A Addendum (2-pages dated Jan 2021)

Springfield Creek Interceptor Sewer, Cooling Water Blow Down Sewer and Equalization Lagoon Phase 1A Concept Refinement Basis of Design Technical Memorandum (Nov 2020)

Lift Stations and Force Mains Phase 1A Concept Refinement basis of Design Technical Memorandum (Dec 2020)

Zwiebel Creek Interceptor Sewer Phase 1A Basis of Design Technical Memorandum (Dec 2020)

Original Land Use Assumptions for Sewer Design Flows

Sewer Flow Projection Assumptions App  https://arcg.is/0vezPn